Integrated design charrette for the Beaver Barracks, Ottawa : NH18-22/112-101E

Through the planning and facilitation of the integrated design charrette, the project development team for the Beaver Barracks was able to identify and implement many additional design and construction features that will improve the overall performance of the buildings. The charrette included a wide variety of project stakeholders with different perspectives on the development project to help ensure the project not only met the needs of the owner and future occupants but also stakeholders impacted by the infill development project.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.620425&sl=1
| Ministère/Organisme |
|
|---|---|
| Titre | Integrated design charrette for the Beaver Barracks, Ottawa |
| Titre de la série |
|
| Type de publication | Monographie - Voir l'enregistrement principal |
| Langue | [Anglais] |
| Autres langues publiées | [Français] |
| Format | Texte matériel |
| Autres formats offerts | Texte numérique-[Anglais] |
| Information sur la publication |
|
| Reliure | Pamphlet |
| Description | 9p. : figs. ; 28 cm. |
| Numéro de catalogue |
|
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.Détails de la page
- Date de modification :